From an anonymous contributor:
Is NIF falling behind more promising fusion technologies?
In 2012, NIF failed to reach ignition and the “LIFE” program was mothballed. In 2026, NIF “still consumes significantly more energy than it produces, indicating that practical, commercial fusion power is still a long way”.
TAE Technologies is doing aneutronic fusion research that may cost 10x LESS per GW than a post NIF fusion power plant, and do so with significantly reduced neutron radiation damage lowering reactor maintenance.
If the NNSA brings back underground nuclear testing at NTS in 2026, will funding for NIF increase, decrease, or be unaffected?