Wyden presses Perry over Hanford possible cleanup

"Wyden Presses Energy Secretary over Possible Hanford Cleanup Cover-up"

https://www.wyden.senate.gov/news/videos/watch/wyden-presses-energy-secretary-over-possible-hanford-cleanup-cover-up

Comments

Anonymous said…
U.S. Department of Energy statement:

“DOE is committed to the safety of the workers, public and the environment. One very important aspect of that commitment is strong oversight of the construction of the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site. The Department recently identified that the quality assurance records needed to demonstrate the pedigree of the safety significant structural steel used in WTP facilities were not adequate. The Department directed Bechtel National Inc. to gather the necessary documentation and provide it to the Department. When received, DOE will determine whether the documentation meets applicable quality assurance standards for the steel being used in the WTP facilities. The Department takes its oversight and mission execution responsibility seriously, and will continue to provide strong, safety-focused oversight of the WTP project.”

http://nwnewsnetwork.org/post/feds-demand-documents-contractor-safety-hanford-steel
Anonymous said…

Hanford... who is in charge of that? Oh Bechtel, what could go wrong with that. Best put them in complete control of Los Alamos.
Anonymous said…
Walter Tamosaitis and Donna Busche alleged that Bechtel and URS (both LLC members of LANS and LLNS) removed them from the Hanford project because they raised safety concerns.
Anonymous said…
WTP is a money grab. The state (oregon and washington) have NO interest in finishing the plant. They get $600M a year into their economy. IF they wanted to finish, they would let the constructor finish. Look to South Carolina if you don't believe me. Same tech, generally the same waste, been operating since the early 90's producing glass logs. SRS Defense waste processing facility, built by Bechtel and designed by Bechtel/AECOM....

https://www.srs.gov/general/news/factsheets/srr_dwpf.pdf


The game is to come up with reason after reason why it should not finish. Change the requirements or make a ridiculous requirement like "able to process any possible thing in the tanks that we don't know what is in them" (DOE does not even have a consensus on what is in the tanks and has not sufficiently sampled in the past 20 years), DOE rejects the technology provided by the DOE to Bechtel during the BNFL transition in the early 2000s (pulse jets), DOE stores the worst constituents in the worst tanks and stores LLW water in the best tanks, etc. It will never finish until the citizens freak out due to contamination in mass quantities hitting the river. When it can get done in South Carolina but not Washington and it is the same tech, one must examine the other variables like politics.

Popular posts from this blog

Plutonium Shots on NIF.

Tri-Valley Cares needs to be on this if they aren't already. We need to make sure that NNSA and LLNL does not make good on promises to pursue such stupid ideas as doing Plutonium experiments on NIF. The stupidity arises from the fact that a huge population is placed at risk in the short and long term. Why do this kind of experiment in a heavily populated area? Only a moron would push that kind of imbecile area. Do it somewhere else in the god forsaken hills of Los Alamos. Why should the communities in the Bay Area be subjected to such increased risk just because the lab's NIF has failed twice and is trying the Hail Mary pass of doing an SNM experiment just to justify their existence? Those Laser EoS techniques and the people analyzing the raw data are all just BAD anyways. You know what comes next after they do the experiment. They'll figure out that they need larger samples. More risk for the local population. Stop this imbecilic pursuit. They wan...

Trump is to gut the labs.

The budget has a 20% decrease to DOE office of science, 20% cut to NIH. NASA also gets a cut. This will  have a huge negative effect on the lab. Crazy, juts crazy. He also wants to cut NEA and PBS, this may not seem like  a big deal but they get very little money and do great things.

tcp1 looking good

I just received my annual TCP-1 letter from LLNS and a summary of the LLNS Pension Plan. Looked in pretty good shape in 2013. About 35% overfunded (funding target attainment percentage = 134.92%). This was a decrease from 2012 where it was 51% overfunded (funding target attainment percentage = 151.59%). They did note that the 2012 change in the law on how liabilities are calculated using interest rates improved the plan's position. Without the change the funding target attainment percentages would have been 118% (2012) and 105% (2013). 2013 assets = $2,057,866,902 2013 liabilities = $1,525,162,784 vs 2012 assets = $1,844,924,947 2012 liabilities = $1,217,043,150 It was also noted that a slightly different calculation method ("fair market value") designed to show a clearer picture of the plan' status as December 31, 2013 had; Assets = $2,403,098,433 Liabilities = $2,068,984,256 Funding ratio = 116.15% Its a closed plan with 3,781 participants. Of that number, 3,151 wer...