This BLOG is for LLNL present and past employees, friends of LLNL and anyone impacted by the privatization of the Lab to express their opinions and expose the waste, wrongdoing and any kind of injustice against employees and taxpayers by LLNS/DOE/NNSA. The opinions stated are personal opinions. Therefore, The BLOG author may or may not agree with them before making the decision to post them. Comments not conforming to BLOG rules are deleted. Blog author serves as a moderator. For new topics or suggestions, email jlscoob5@gmail.com

Blog rules

  • Stay on topic.
  • No profanity, threatening language, pornography.
  • NO NAME CALLING.
  • No political debate.
  • Posts and comments are posted several times a day.

Monday, September 28, 2015

Nuc safety board report

Monthly (July) Site Summary for LLNL by the DEFENSE NUCLEAR FACILITIES SAFETY BOARD contains some newsworthy items. Here it is...

TO: Steven A. Stokes, Technical Director
FROM: Matthew P. Duncan, Cognizant Engineer
SUBJECT: Lawrence Livermore National Laboratory Report for July 2015
August 7, 2015
DNFSB Staff Activity: E. Gibson, M. Duncan, and outside expert R. Green participated in two teleconferences with LLNL, LFO, and subcontractor personnel to discuss the draft Probabilistic Seismic Hazard Analysis update for LLNL.

Safety Basis: Earlier this year, LLNL had discovered that some safety basis calculations used embedded computer code that had not been verified in accordance with LLNL’s software quality assurance requirements or identified on its list of approved safety software. These results triggered a declaration of a potential inadequacy in the safety analysis and a positive unreviewed safety question. As one of the corrective actions, LLNL performed an extent of condition review to comprehensively evaluate all calculations cited in each nuclear facility’s documented safety analysis. This effort uncovered ten additional calculations without the appropriate software quality assurance. Every nuclear facility was affected, with the exception of the Radiography Facility. In general, most were related to structural or seismic analyses. LLNL declared a potential inadequacy in the safety analysis, but does not believe any compensatory measures are required as the calculations were performed using widely distributed software commonly used for engineering applications.

Plutonium Facility: LLNL requested and LFO approved a proposal to modify the fire suppression system and how it is credited in the documented safety analysis. The fire suppression system supplies backup water to the exhaust duct sprays that protect the final HEPA filters from high temperatures during postulated fire scenarios. To increase the amount of firewater available, the 7500 gallon firewater tank will now be used instead of the 2500 gallon tank. The safety class nitrogen skid is no longer considered necessary and will be taken out of service. As a condition of approval, LFO required that the designation of alarms related to pressure in the firewater tank be upgraded to “defense-in-depth equipment important to safety.”
While preforming a weekly surveillance for the room ventilation system, LLNL determined that the differential pressure between a laboratory room and the corridor was outside of the allowable range per the Technical Safety Requirements. The room is currently being used for waste container storage. LLNL entered the appropriate limiting condition for operation and rebalanced the system.

Hardened Engineering Test Building: LLNL completed installation of a new electron beam welder. The current scope of operations prohibits welding items containing radioactive material. LLNL sent a request to LFO to allow welding items containing depleted uranium. LFO is evaluating the proposal.

Waste Storage Facilities: Late last month, LLNL declared a potential inadequacy in the safety analysis for pipe overpack containers. This month, LLNL determined that it is a positive unreviewed safety question.

6 comments:

Anonymous said...

Same old day-in and day-out safety and security issues that occur at LANL. Big deal.

Anonymous said...

In general, most were related to structural or seismic analyses... [DNFSB]
Livermore/Bay Area is likely to have a sizable quake in our near future. Errors that may have led to an overly optimistic assessment of hazardous materials releases, not to mention falling down walls, during an earthquake are not insignificant.

Anonymous said...

This appears to be old news.

The fact that you haven't seen anything more done with these issues by anyone means it's relatively minor. The DNFSB certainly wouldn't hesitate to write a letter on it otherwise.

Structural codes are commonly used throughout industry. The ones used in this case are probably very well established. There's no reason to believe significant vulnerabilities exist in the actual facility response to an earthquake simply because someone didn't fill out all the paperwork for a largely redundant software quality assurance exercise.

Finally, as I read this, it was discovered and self reported by the Lab. That means they're doing their job. That also means they are required to investigate the ramifications of this discovery. The conclusion that no compensatory measures are needed wouldn't just be someone's off the cuff guess.

Anonymous said...

Small real risk to personnel and property. Ductile structures with modern joints fail at 2 - 3 more load than predicted by conservative material prpoerties alone. May deform a bit more, but even a Fukisima or Chilean massive ground motion is unlikely to fail a modern strucure.

Connections for related utilities and safety systems need careful examination. They are often overlooked.

Anonymous said...

Pu building holds almost nothing.

Anonymous said...

More scooby censorship.